Re: pgadmin 1.8.4 pgagent schedule issue - Mailing list pgadmin-support
From | susan.williams@us.michelin.com |
---|---|
Subject | Re: pgadmin 1.8.4 pgagent schedule issue |
Date | |
Msg-id | OFAA23F7A3.DF1411A0-ON852574D6.005CFE91-852574D6.005D8D6D@michelin.com Whole thread Raw |
In response to | Re: pgadmin 1.8.4 pgagent schedule issue ("Dave Page" <dpage@pgadmin.org>) |
Responses |
Re: pgadmin 1.8.4 pgagent schedule issue
|
List | pgadmin-support |
<br /><font face="sans-serif" size="2">Dave - I added comments; but, it still doesn't recognize the date even though it isthere. The date in the start date field is 10/03/08. I tried using the format you used below. When I manually typedin the date 10/03/2008, it removed the visible date from the field.</font><br /><br /><font face="sans-serif" size="2">SusanWilliams<br /> Michelin North America<br /> 1401 Antioch Church Road<br /> Greenville, SC 29605<br /> IS/US1<br/> Phone: 864-458-1455 (internal: x71455 or 787-1455) <br /><br /> D3 – Michelin Restricted<br /> Retention: 201-101< 90 Days <br /></font><br /><br /><br /><table width="100%"><tr valign="top"><td width="40%"><font face="sans-serif"size="1"><b>"Dave Page" <dpage@pgadmin.org></b> </font><p><font face="sans-serif" size="1">10/02/0812:01</font></td><td width="59%"><table width="100%"><tr valign="top"><td><div align="right"><font face="sans-serif"size="1">To</font></div></td><td><font face="sans-serif" size="1">susan.williams@us.michelin.com</font></td></tr><trvalign="top"><td><div align="right"><font face="sans-serif" size="1">cc</font></div></td><td><fontface="sans-serif" size="1">pgadmin-support@postgresql.org</font></td></tr><tr valign="top"><td><divalign="right"><font face="sans-serif" size="1">Subject</font></div></td><td><font face="sans-serif"size="1">Re: [pgadmin-support] pgadmin 1.8.4 pgagent schedule issue</font></td></tr></table><br /><table><trvalign="top"><td></td><td></td></tr></table><br /></td></tr></table><br /><br /><br /><tt><font size="2">On Thu,Oct 2, 2008 at 4:21 PM, <susan.williams@us.michelin.com> wrote:<br /> ><br /> > I am experiencing an issuewith pgadmin 1.8.4 (Windows). The issue is with<br /> > the pgagent job scheduler. I am able to create new jobsand steps.<br /> > However, I am unable to create a new schedule. I am also unable to edit /<br /> > change aschedule that currently exist. The schedule window informs me that<br /> > I must enter a start date. I do this andit still does not recognize that<br /> > it has a date and will not activate the OK button even though there is a<br/> > visible date in the field. I have used the drop down in the field as well<br /> > as tried typing in thedate with no luck. One of my co-workers is having<br /> > the same problem and is running the same version (1.8.4- however he is<br /> > running linux ). The other co-worker is not having this problem and is<br /> > runningversion 1.8.0 (linux ). I tried to go back to 1.8.0(Windows); but,<br /> > was still unable to create a new schedule. Thanks for your assistance<br /> > regarding this issue.<br /> ><br /><br /> It works for me on OS X, thoughsomewhat annoyingly it seems to be<br /> using MM/DD/YYYY. If you modify another control after selecting the<br />date (ie. add a comment), does that allow it to recognise there's a<br /> date there?<br /><br /> -- <br /> Dave Page<br/> EnterpriseDB UK: http://www.enterprisedb.com<br /></font></tt><br />
pgadmin-support by date: